Syrian Engineers for Construction and Development, in cooperation with Dana’s local council, conducted a solid waste campaign at Dana city, with the participation of more than 50 cleaning workers. The activities were disposing the accumulated waste and garbage in the main and secondary streets of Maktab al-Dur Street at Dana city.