Rehabilitation pump station and water network

Based on the importance of water in the lives of the population. SECD organization conducted training with title Rehabilitation pump station and water network .

The training conducted in Termanin city from 20 to 23 March 2017 .

The training was attended by 19 trainees.

The training including the following axes :

1- water resources : Wells and their exploitation and methods of drilling. Water tanks. Civil works for investment of networks and rationalization of water consumption

2-Mechanical and electrical works: practical examples at the expense of the capacity of pumps and electrical equipment related to them.

3-Chemical analyzes: This axis includes how to analyze water and methods used to sterilize drinking water.

4-Network measurement : Define the EPA program and how to use it. Explain the design of water purification plants

5- Fees: Definition of the importance of fees and ways of calculating the operational cost and external factors affecting the fees

SECD management would like to thank everyone who participated in the success of our training .